Transportation

Fullerton Road Grade Separation

Fullerton Road Grade Separation

This complex 5-stage project in the City of Industry involves multiple phases, including extensive railroad track, retaining wall, bridge, sewer, and storm drain construction, with a primary focus on minimizing disruption to adjacent businesses and addressing specific railroad infrastructure needs.

Middle Harbor Slip E

Middle Harbor Slip E

I-10 Riverside Avenue Interchange

I-10 Riverside Avenue Interchange

BergCM served as Prime for this $35.7 million interchange replacement project, featuring ramp widening, bridge reconstruction, traffic management, coordination with BNSF, and interaction with residents, businesses, and truck traffic.

Gypsum Canyon Bridge Over the Santa Ana River

Gypsum Canyon Bridge Over the Santa Ana River

This $20 million arterial road bridge was constructed across the environmentally sensitive and seasonally active Santa Ana River and required extensive interfacing and permit work with Caltrans.

Eisenhower Drive Bridge Widening and Drainage Improvements

Eisenhower Drive Bridge Widening and Drainage Improvements

BergCM oversaw construction, inspection, and monitoring for the Eisenhower Bridge Widening project in La Quinta, which included traffic control, a concrete bridge, and signalization, marking the completion of the city's $2.5 million arterial program

Portola Ave Bridge

Portola Ave Bridge

The $11 million Portola Avenue Bridge project successfully utilized cost-saving measures, navigated challenges including sensitive habitat construction, and ensured minimal disruption to traffic flow on a major La Quinta roadway.