
Raymond Avenue Grade Separation
BergCM served as Prime for this grade separation project, which had detour routes, retaining walls, landscaping, utility relocations, signals, demolition and roadway reconstruction, paving and catch basins.
BergCM served as Prime for this grade separation project, which had detour routes, retaining walls, landscaping, utility relocations, signals, demolition and roadway reconstruction, paving and catch basins.
This $20 million arterial road bridge was constructed across the environmentally sensitive and seasonally active Santa Ana River and required extensive interfacing and permit work with Caltrans.
BergCM oversaw construction, inspection, and monitoring for the Eisenhower Bridge Widening project in La Quinta, which included traffic control, a concrete bridge, and signalization, marking the completion of the city's $2.5 million arterial program
The $11 million Portola Avenue Bridge project successfully utilized cost-saving measures, navigated challenges including sensitive habitat construction, and ensured minimal disruption to traffic flow on a major La Quinta roadway.