Utilities

PCH at Hawthorne Intersection Improvement Project

PCH at Hawthorne Intersection Improvement Project

Intersection widening at Hawthorne Boulevard and Pacific Coast Highway to in order to create dual left-hand turn lanes and right-turn pockets at all four approaches.

Sludge Drying Beds 16-18 and 19-26 Rehab

Sludge Drying Beds 16-18 and 19-26 Rehab

Melrose Avenue Streetscape Improvement

Melrose Avenue Streetscape Improvement

Storm Drain Line 20

SR-55/Ritchey St Water Improvement Projects

SR-55/Ritchey St Water Improvement Projects

W-289 Magnolia Avenue RPU Interconnection

W-289 Magnolia Avenue RPU Interconnection

The Magnolia Avenue Interconnection with Riverside Public Utilities (RPU) Project includes the construction of approximately 2,300-lf of 16-inch PVC C900 pipe, a metering and flow control vault for RPU, and a meter and motor operated butterfly valve vault for Western.

Rule 20B Undergrounding

Rule 20B Undergrounding

The work for the Rule 20B Undergrounding is focused on the removal of overhead electrical and telecom wires and associated infrastructure, and replacement with new underground system within public right-of-way and private property.

Frisbie Park Sewer Lift Station

Frisbie Park Sewer Lift Station

Water Main Improvements on Cedar Street & Walnut Avenue

Water Main Improvements on Cedar Street & Walnut Avenue

FY 15/16 & 18/19 Annual Water Main Replacement

FY 15/16 & 18/19 Annual Water Main Replacement