Traffic Signals

Beverly Hills N. Santa Monica Boulevard

Beverly Hills N. Santa Monica Boulevard

Removal and replacement of 1.5 miles of roadway, utility relocations, traffic signals, ADA compliant sidewalks and curbs, street widening, new turn lanes, landscaping and construction of bioswale.

Alder Avenue & Randall Avenue Street Improvements

Alder Avenue & Randall Avenue Street Improvements

BergCM provided construction management, inspection, and materials testing services for the $4.5 million dual roadway project in Rialto, enhancing traffic flow and safety on Alder Avenue and Randall Avenue by improving signals, adding lanes, sidewalks, landscaping, and addressing a six-point intersection while effectively coordinating utility relocations and traffic control

Sunset Strip Beautification

Sunset Strip Beautification

BergCM served as the prime construction manager for the federally funded Sunset Strip Beautification Project, which involved resurfacing 1.65 miles of roadway, upgrading traffic signals, ensuring ADA compliance for sidewalks and driveways, and providing public outreach services for nearby businesses and residents, including a 24-hour helpline.

Frisbie Park Sewer Lift Station

Frisbie Park Sewer Lift Station

FY 15/16 & 18/19 Annual Water Main Replacement

FY 15/16 & 18/19 Annual Water Main Replacement

Wilmington Waterfront Park

Wilmington Waterfront Park

As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.

On-Call Construction Management and Inspection Support Services

On-Call Construction Management and Inspection Support Services

The SR-23 Widening and Sound Wall Project added lanes to SR-23, including sound walls, while the State Route 118 Widening Project expanded the Ronald Reagan Highway with additional lanes, bridge modifications, sound walls, landscaping, detector loops, ramp meters, and changeable message signs.

SR-60 Bridge Widenings and HOV Lane Construction

SR-60 Bridge Widenings and HOV Lane Construction

The project involved adding 16 miles of HOV lanes in both directions between Pigeon Pass and Redlands Boulevard, which included bridge demolition, construction of five overcrossings, Caltrans oversight, and stormwater management measures.