Beverly Hills N. Santa Monica Boulevard
Removal and replacement of 1.5 miles of roadway, utility relocations, traffic signals, ADA compliant sidewalks and curbs, street widening, new turn lanes, landscaping and construction of bioswale.
Removal and replacement of 1.5 miles of roadway, utility relocations, traffic signals, ADA compliant sidewalks and curbs, street widening, new turn lanes, landscaping and construction of bioswale.
int. ChatGPT "111th Place Park, situated in a residential block, has been transformed from a single residential lot into a vibrant community space with exercise and play equipment, a colorful shade sail structure, drought-tolerant landscaping, and a captivating rainbow fence mural.
Located on West Boulevard in Los Angeles Council District 10, this park is complete with play equipment on rubberized surfacing, exercise equipment, drought tolerant plants and lush green grass. Benches, tables and chairs nestle under a one-of-a-kind shade structure with letter cutouts inspired by a poem written by local elementary school children.
As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.
The SR-23 Widening and Sound Wall Project added lanes to SR-23, including sound walls, while the State Route 118 Widening Project expanded the Ronald Reagan Highway with additional lanes, bridge modifications, sound walls, landscaping, detector loops, ramp meters, and changeable message signs.
The project involved adding 16 miles of HOV lanes in both directions between Pigeon Pass and Redlands Boulevard, which included bridge demolition, construction of five overcrossings, Caltrans oversight, and stormwater management measures.