Electrical

Fullerton Road Grade Separation

Fullerton Road Grade Separation

This complex 5-stage project in the City of Industry involves multiple phases, including extensive railroad track, retaining wall, bridge, sewer, and storm drain construction, with a primary focus on minimizing disruption to adjacent businesses and addressing specific railroad infrastructure needs.

Alameda Corridor Projects

Alameda Corridor Projects

Green Port Gateway Rail Project (Ocean Blvd/Pier F Support Yard Track Realignment Program)

Green Port Gateway Rail Project (Ocean Blvd/Pier F Support Yard Track Realignment Program)

BergCM performed as the Prime Consultant managing the installation of 29,000 feet of railroad track, 1,070 feet of track realignment, 8 crossovers, 18 turnouts, 5,600 linear feet of retaining walls, and the installation of 23 light poles.

Los Angeles Union Station Platform 7

Los Angeles Union Station Platform 7

BergCM oversaw the reconstruction of Platform 7 at Los Angeles Union Station, enhancing its capacity for increased rail traffic with reinforced concrete platforms, a new steel canopy, continuous welded rail, and vintage-inspired stairways and ramps.

Wilmington Waterfront Park

Wilmington Waterfront Park

As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.

On-Call Construction Management and Inspection Support Services

On-Call Construction Management and Inspection Support Services

The SR-23 Widening and Sound Wall Project added lanes to SR-23, including sound walls, while the State Route 118 Widening Project expanded the Ronald Reagan Highway with additional lanes, bridge modifications, sound walls, landscaping, detector loops, ramp meters, and changeable message signs.