Los Angeles Union Station Platform 7
BergCM served as construction manager for the award-winning reconstruction of Platform 7 at the Los Angeles Union Station which was restored to accommodate increased rail traffic. The project featured reinforced concrete platforms, a new bolted steel canopy, continuous welded rail, plus new stairways and accessible ramps on the north and south sides that match the vintage aesthetics of Union Station.
Services Provided
Construction Management | Document Control | Inspection | Resident Engineering Services
Construction Management | Document Control | Inspection | Resident Engineering Services