Los Angeles Union Station Platform 7

BergCM served as construction manager for the award-winning reconstruction of Platform 7 at the Los Angeles Union Station which was restored to accommodate increased rail traffic. The project featured reinforced concrete platforms, a new bolted steel canopy, continuous welded rail, plus new stairways and accessible ramps on the north and south sides that match the vintage aesthetics of Union Station.