Sidewalks

PCH at Hawthorne Intersection Improvement Project

PCH at Hawthorne Intersection Improvement Project

Intersection widening at Hawthorne Boulevard and Pacific Coast Highway to in order to create dual left-hand turn lanes and right-turn pockets at all four approaches.

Melrose Avenue Streetscape Improvement

Melrose Avenue Streetscape Improvement

W-289 Magnolia Avenue RPU Interconnection

W-289 Magnolia Avenue RPU Interconnection

The Magnolia Avenue Interconnection with Riverside Public Utilities (RPU) Project includes the construction of approximately 2,300-lf of 16-inch PVC C900 pipe, a metering and flow control vault for RPU, and a meter and motor operated butterfly valve vault for Western.

CC-1450 Admiralty Bridge

CC-1450 Admiralty Bridge

A 3-span steel girder bridge with 4-column reinforced concrete bents supported on timber piles

Beverly Hills N. Santa Monica Boulevard

Beverly Hills N. Santa Monica Boulevard

Removal and replacement of 1.5 miles of roadway, utility relocations, traffic signals, ADA compliant sidewalks and curbs, street widening, new turn lanes, landscaping and construction of bioswale.

Alder Avenue & Randall Avenue Street Improvements

Alder Avenue & Randall Avenue Street Improvements

BergCM provided construction management, inspection, and materials testing services for the $4.5 million dual roadway project in Rialto, enhancing traffic flow and safety on Alder Avenue and Randall Avenue by improving signals, adding lanes, sidewalks, landscaping, and addressing a six-point intersection while effectively coordinating utility relocations and traffic control

Sunset Strip Beautification

Sunset Strip Beautification

BergCM served as the prime construction manager for the federally funded Sunset Strip Beautification Project, which involved resurfacing 1.65 miles of roadway, upgrading traffic signals, ensuring ADA compliance for sidewalks and driveways, and providing public outreach services for nearby businesses and residents, including a 24-hour helpline.

Alameda Corridor Projects

Alameda Corridor Projects

Wilmington Waterfront Park

Wilmington Waterfront Park

As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.