PCH at Hawthorne Intersection Improvement Project
Intersection widening at Hawthorne Boulevard and Pacific Coast Highway to in order to create dual left-hand turn lanes and right-turn pockets at all four approaches.
Intersection widening at Hawthorne Boulevard and Pacific Coast Highway to in order to create dual left-hand turn lanes and right-turn pockets at all four approaches.
The Magnolia Avenue Interconnection with Riverside Public Utilities (RPU) Project includes the construction of approximately 2,300-lf of 16-inch PVC C900 pipe, a metering and flow control vault for RPU, and a meter and motor operated butterfly valve vault for Western.
A 3-span steel girder bridge with 4-column reinforced concrete bents supported on timber piles
Removal and replacement of 1.5 miles of roadway, utility relocations, traffic signals, ADA compliant sidewalks and curbs, street widening, new turn lanes, landscaping and construction of bioswale.
BergCM provided construction management, inspection, and materials testing services for the $4.5 million dual roadway project in Rialto, enhancing traffic flow and safety on Alder Avenue and Randall Avenue by improving signals, adding lanes, sidewalks, landscaping, and addressing a six-point intersection while effectively coordinating utility relocations and traffic control
BergCM served as the prime construction manager for the federally funded Sunset Strip Beautification Project, which involved resurfacing 1.65 miles of roadway, upgrading traffic signals, ensuring ADA compliance for sidewalks and driveways, and providing public outreach services for nearby businesses and residents, including a 24-hour helpline.
As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.