Paving

Jamboree Paving Rehabilitation CIP 311802

Jamboree Paving Rehabilitation CIP 311802

The Jamboree Road Pavement Rehabilitation project includes the design and construction of pavement rehabilitation for deteriorated sections along Jamboree Road between Michelle Drive and the Metrolink railroad tracks.

Melrose Avenue Streetscape Improvement

Melrose Avenue Streetscape Improvement

W-289 Magnolia Avenue RPU Interconnection

W-289 Magnolia Avenue RPU Interconnection

The Magnolia Avenue Interconnection with Riverside Public Utilities (RPU) Project includes the construction of approximately 2,300-lf of 16-inch PVC C900 pipe, a metering and flow control vault for RPU, and a meter and motor operated butterfly valve vault for Western.

Beverly Hills N. Santa Monica Boulevard

Beverly Hills N. Santa Monica Boulevard

Removal and replacement of 1.5 miles of roadway, utility relocations, traffic signals, ADA compliant sidewalks and curbs, street widening, new turn lanes, landscaping and construction of bioswale.

Alder Avenue & Randall Avenue Street Improvements

Alder Avenue & Randall Avenue Street Improvements

BergCM provided construction management, inspection, and materials testing services for the $4.5 million dual roadway project in Rialto, enhancing traffic flow and safety on Alder Avenue and Randall Avenue by improving signals, adding lanes, sidewalks, landscaping, and addressing a six-point intersection while effectively coordinating utility relocations and traffic control

Sunset Strip Beautification

Sunset Strip Beautification

BergCM served as the prime construction manager for the federally funded Sunset Strip Beautification Project, which involved resurfacing 1.65 miles of roadway, upgrading traffic signals, ensuring ADA compliance for sidewalks and driveways, and providing public outreach services for nearby businesses and residents, including a 24-hour helpline.

FY 15/16 & 18/19 Annual Water Main Replacement

FY 15/16 & 18/19 Annual Water Main Replacement