Curb & Gutter


W-289 Magnolia Avenue RPU Interconnection
The Magnolia Avenue Interconnection with Riverside Public Utilities (RPU) Project includes the construction of approximately 2,300-lf of 16-inch PVC C900 pipe, a metering and flow control vault for RPU, and a meter and motor operated butterfly valve vault for Western.

CC-1450 Admiralty Bridge
A 3-span steel girder bridge with 4-column reinforced concrete bents supported on timber piles