Port of Los Angeles (POLA)

Pier 300 (Seaside Ave./Navy Way Grade Separation and Seaside Navy Way/Navy Mole Grade Separation)

Pier 300 (Seaside Ave./Navy Way Grade Separation and Seaside Navy Way/Navy Mole Grade Separation)

The construction of two multi-span concrete bridges on Seaside Ave. elevated the road for future unit train services, utilized cost-efficient MSE walls, maintained 24-hour shipping terminal access, involved multi-jurisdictional coordination, and received recognition for excellence in project management.

TraPac Container Terminal Project

TraPac Container Terminal Project

The TraPac Container Terminal Project involved expanding container ship wharves, making backland improvements, constructing a LEED Gold-certified headquarters building for TraPac Shipping, with a total cost of $185 million

Wilmington Waterfront Park

Wilmington Waterfront Park

As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.