
Port of Los Angeles (POLA)


Pier 300 (Seaside Ave./Navy Way Grade Separation and Seaside Navy Way/Navy Mole Grade Separation)
The construction of two multi-span concrete bridges on Seaside Ave. elevated the road for future unit train services, utilized cost-efficient MSE walls, maintained 24-hour shipping terminal access, involved multi-jurisdictional coordination, and received recognition for excellence in project management.

TraPac Container Terminal Project
The TraPac Container Terminal Project involved expanding container ship wharves, making backland improvements, constructing a LEED Gold-certified headquarters building for TraPac Shipping, with a total cost of $185 million

Wilmington Waterfront Park
As Prime Construction Manager, BergCM provided constructibility review, construction management, cost estimating and scheduling for the simultaneous construction of these two landmark projects.