The project demolished two existing beds and reconstructed eight new. In total there is just over 54,000 square feet of 8″ thick reinforced concrete. The perimeter walls are constructed in two parts using water-stop to protect the surrounding soils. The concrete was poured over a 30-mil liner and center drains were removed and reinstalled into a revised design drain trench. This was a $1.2M project, but with Chang Order of $1.3M ended up at $2.5M.
Sludge Drying Beds 16-18 and 19-26 Rehab

Client
Palm Springs - City of
Palm Springs - City of
Project Type
Utilities
Utilities
Palm Springs, CA
Project Details
Key Elements
As Senior Construction Manager, Berg team member Bruce Pretty provided turnkey construction management services, including inspection and administration, and supports the project as an extension of City Staff. This includes submittal/RFI reviews, change management, payment application review, quantity verification, and daily reporting.