PCH at Hawthorne Intersection Improvement Project
Intersection widening at Hawthorne Boulevard and Pacific Coast Highway to in order to create dual left-hand turn lanes and right-turn pockets at all four approaches.
Intersection widening at Hawthorne Boulevard and Pacific Coast Highway to in order to create dual left-hand turn lanes and right-turn pockets at all four approaches.
The Magnolia Avenue Interconnection with Riverside Public Utilities (RPU) Project includes the construction of approximately 2,300-lf of 16-inch PVC C900 pipe, a metering and flow control vault for RPU, and a meter and motor operated butterfly valve vault for Western.
A 3-span steel girder bridge with 4-column reinforced concrete bents supported on timber piles
The construction of two multi-span concrete bridges on Seaside Ave. elevated the road for future unit train services, utilized cost-efficient MSE walls, maintained 24-hour shipping terminal access, involved multi-jurisdictional coordination, and received recognition for excellence in project management.