BergCM served as Prime for this $35.7 million interchange replacement project, featuring ramp widening, bridge reconstruction, traffic management, coordination with BNSF, and interaction with residents, businesses, and truck traffic.
Project Details
Key Elements
Bridge Deck Construction | Cast-in-Place Walls | Concrete Post Tensioning | Falsework | Foundations | Pile Driving | Rail | Shoring | Signalization | Storm Drains | Traffic Control | Transportation
Bridge Deck Construction | Cast-in-Place Walls | Concrete Post Tensioning | Falsework | Foundations | Pile Driving | Rail | Shoring | Signalization | Storm Drains | Traffic Control | Transportation
As Prime, BergCM provided construction management, inspection, materials testing, construction surveying and landscape to SANBAG for this $35.7 million interchange replacement project with Caltrans oversight, funded by state and federal funds and Rialto Redevelopment Agency bonds.
Work included ramp widening, bridge demolition and reconstruction, traffic control, detours, signal installation, striping, signalization upgrades, Caltrans and city traffic management systems, coordination with BNSF and interface with numerous residents, businesses, and truck traffic.